According to the National Road Administration, specifically, road resurfacing work has been completed on three sections of regional road G37, with a total length of 4.65 km, which helps ensure more comfortable and safer driving conditions for residents of the villages of Slobozia-Vărăncău and Vărăncău in Soroca District. The work carried out included road resurfacing, shoulder reinforcement, earthworks, and the installation of drainage systems. In addition, repairs were performed on the bridge at the 8.02-kilometer mark, as well as on seven side bridges and three cross bridges. Measures were also taken to improve traffic safety, such as the installation of 30 signs, 50 guideposts, and the application of road markings over an area of 1,102.5 square meters. The G37 R14 – Slobozia-Cremene – Vărăncău – Temeleuți – G38 plays an important role in the local road network, connecting settlements in this area to the R14 and G38 roads. The acceptance committee determined that the work was completed in accordance with the terms of the technical specifications. The contract value was 24,986,891.28 lei, with funds allocated from the Road Fund. // 18.11.2026 — InfoMarket.