The National Road Administration has announced a tender for design services to prepare a feasibility study for the construction of a section of the A8 highway—from the interchange in Ungheni to the intersection with the M5/R5 roads near the village of Budesti. The estimated contract value is 87,880,950 lei, excluding VAT. The winner will be selected based on the lowest price. The clarification period will last until September 4, and bids will be accepted from September 4 through September 21. No electronic auction is planned, so the price submitted by participants will be final. According to the procurement documentation, the contract with the winning bidder is scheduled to run from October 19, 2026, through September 30, 2027. The feasibility study currently being developed is intended to serve as the basis for the further design and construction of the Moldovan section of the A8 Ungheni–Chișinău–Odessa highway. // 14.08.2026 — InfoMarket.
Approximately 88 million lei will be allocated for the feasibility study on the construction of the Moldovan section of the A8 highway
Approximately 87.9 million lei are planned to be allocated for the development of a feasibility study for the construction of the Moldovan section of the A8 Ungheni–Chisinau–Odessa highway